The following is a comprehensive list of SUNY projects that RAM TECH Engineers has provided services for:
Alfred
- Athletic Field Rehabilitation
- Hinkle Library Study
- Athletic Field New Electrical Service
Binghamton
- Hughes Hall ADA Improvements
- Cleveland Hall ADA Improvements
Brockport
- Toilet Room Renovations
- Parking Lot V-West Lighting
- Cooper Hall Roof Replacement
Buffalo State College
- Moore Hall Rehabilitation
- Roof Replacement – Various Buildings Group B
- Campbell Student Union Asbestos Abatement and Rehabilitation
Canton
- Athletic Site Reconstruction
- Elevator Services
- Summer Water Heater
Cobleskill
- Day Care Center
- Dairy Complex
College of Environmental Science & Forestry
- Replacement of Main Electrical Feeders
- Master Plan
- Display Room
- Moon Library Electrical Modifications
- Marshall Hall
Cortland
- Bishop Hall Renovation
- Hayes Hall Renovation
- The Glass Tower – New Dormitory
- Sperry Learning Resource Center
- Fuel Dispensing Station
- Miller Administration Building – First Floor Rehabilitation
- Clark Hall Building Rehabilitation
- Higgins Hall Building Rehabilitation
- Park Center Sanitary/Storm Replacement
Downstate Medical Center
- Facility Assessment Survey
Fredonia
- Mason Hall Annex Extension of Existing Fire Alarm System
- Jewett Hall Air Handling Unit
- Fenton/Reed Sidewalk Lighting Design of Pole Mount Exterior Lighting
- Campus Wide Mass Notification System
- Kasling Hall Interior Renovations
- Maytum Hall Electric Feeder Replacement
- Maytum Hall Access Control System
- Thompson Hall Mass Notification System
- McEwen Hall / Reed Library Access Control, Electrical and Door Installation
- Grissom Hall Interior Renovations
- Athletic Complex Lighting
- Thompson Hall Fire Alarm Upgrades
- Thompson Hall Mass Notification System
- Campus and Community Children’s Center Site Utilities
Geneseo
- Dormitories Master Plan
Institute of Technology
- Adirondack Hall Lightning Protection Study
- Donovan Hall Boiler Replacement
- Kunsella Hall Air Intake Evaluation
Morrisville
- Oneida Residence Hall Renovations
- Cayuga Residence Hall Renovations
- Dairy Complex
- Cayuga Residence Hall Renovations
- Emergency Generator
- Shannon Hall Evaluation
Oneonta
- Chiller Replacement and Cooling Tower Modification
- Wilber Hall Renovation
- Rehabilitate Sciences Building (Study)
- Littell Hall Additions and Renovations
- Golding Hall Renovations
- Tobey Hall Data / Telephone Systems
Onondaga Community College
- Master Plan
- Applied Technology Center
- Telephone System
- Maintenance Building HVAC work
- Ferrante Hall Renovation
Oswego
- New Townhouse Complex
- Fire Safety Improvements
- Laker Hall Weigh Room Replace Bleachers / Refinish Floor
- Lakeside Dining Hall Asbestos Removal
- Master Plan
Plattsburgh
- Plaza Lighting
- Storage Room Sprinkler
- Rehabilitation of Park Hall Auditorium
- Site Lighting Improvements
- Art Building
- Snygg Hall Renovation
- Rich Hall Commissioning
- Elevator Rehabilitation
- Infirmary Building HVAC
Potsdam
- Replace Emergency Generators
University at Buffalo
- Jacobs Hall Addition
- North Campus ADA Improvements
- Roof Replacement – 7 Building
Upstate Medical University
From 1991 to the present, RAM-TECH has provided mechanical / electrical design and construction administration services for various projects in nearly all of SUNY Upstate’s buildings:
Campus Activities Building
- Upgrade Electrical Infrastructure
- Renovate Room 210 CAB
- Campus Activities Building Study
- Provide Emergency Power
Campus West Building
- 3rd Floor Computer Room Power Changes
- Computer Room Upgrade
- Regional Oncology Center
- CWB 2nd Floor Renovate for Offices
Clark Tower
- 2nd, 3rd & 4th Floor Renovations
- Emergency Generator (designed, but not constructed)
Institute For Human Performance
- Clinical Research Unit Renovations
Miscellaneous
- Parking Lot I Lighting System
- Parking Garages East and West
- Exterior Lighting Upgrade
- Campus Enhancements
- Adams Street Beautification
- West Parking Garage Demolition Study
Silverman Hall
- Roof Replacement
Jacobsen Hall
- Satellite CDU Study
- Relocate CDU Test Booths
- Provide Emergency Power
- Code Compliance Study
- Sprinkler System
- Fire Alarm System
- Asbestos Abatement
- Fire Safety Improvements
- 2nd Floor Renovations
- 4th Floor Fire Protection Changes
- 6th Floor Renovations
- As‑Builts (Floors 5, 6, 7)
University Health Care Center
- Code Review and Feasibility Study
Weiskotten Hall Addition
- Transformer Replacement
- 9th Floor Renovation, Sprinkler System and Kitchen
- Microbiology Lab 2273
- Emergency Transfer Switches
- Renovate Room 1273
Weiskotten Hall
- Renovate Electron Microscope Room 101
- Pharmacology 3 Study
- DLAR Tunnel Washer Install
- Gross Anatomy Lab Renovations.
- Angiography Laboratory Rehabilitation
- Rehabilitation – Phase II
- Southeast Wing Renovations
- Pharmacology
- Pathology Department Office Layout
- Anatomy Labs Rooms 1139/1141/1142
- Renovate Gross Pathology Lab 2135/2137
- Renovate Rooms 1166/1201, 1223-1227, 1254, 1201, 1166
- Renovate Lab 1138
University Hospital
- University Hospital Capital Plan
- Cancer Center Site Utilities Relocation
- Vertical Expansion / Golisano Children’s Hospital
- UH Complex Medical Gas Upgrades
- Pharmacy & OR Sterilization Expansion
- Automate East Wing Substation “A” and “B” Tie Breakers
- HDR Brachytherapy
- Radiation Oncology Dosimetry
- Lobby Expansion
- 1st Floor Admission/Registration
- Phlebotomy
- UH Continuum of Care/Lobby
- OB/GYN
- Urology Clinic and Offices
- UH Pain Treatment Clinic
- EMG/Clinical Neurophysiology
- Gift Shop and Coffee Bar
- EP Lab Renovations, 3 North
- Neuroangio 3 West Renovations
- 3 North Humidification Project
- UH 3rd Floor West Radiology Renovations
- UH Emergency Department Renovations
- 4N/4C Omnicell
- Refurnish Psychiatric Inpatient Unit 4B
- UPS System ‑ 4th Floor
- Morgue Alterations for Body Coolers
- New Pharmacy Carousels
- Fan Guard Survey & Design
- Cytology/Histology 6 South Renovations
- UH Pathology 6 South Renovations
- Clinical Research Lab Room 6709
- 6th Floor ICU Room Renovation
- North Wing Patient Bath Room 4209
- Replace Neurostar Equipment
- ASC Pediatrics Reconfiguration
- FUJI X-ray Machine Install
- 7 North Renovations
- 7A Renovations
- Rehab Labs and Vivarium Space
- 9th Floor Telephone Room Renovation
- Pediatrics Security Upgrade
- OR Endoscopic Surgery Renovations
- Non Acute Short Stay Unit
- UH Pathology Core Lab Renovations
- Vascular Laboratories
- Bone Marrow Observations
- Install Booster Pumps East Wing Addition
- Food Service Dishwasher Install
- Boiler Plant RO System
- BL2 Heating Coil Replacement
- UH Rack Washer Install