SUNY Experience

Since 1989, RAM-TECH Engineers has provided professional engineering services for over 20 SUNY campuses. We understand the needs of SUNY schools, and have extensive experience with SUNY’s design procedures.

The following is a comprehensive list of SUNY projects that RAM TECH Engineers has provided services for:

Alfred

  • Athletic Field Rehabilitation
  • Hinkle Library Study
  • Athletic Field New Electrical Service

Binghamton

  • Hughes Hall ADA Improvements
  • Cleveland Hall ADA Improvements

Brockport

  • Toilet Room Renovations
  • Parking Lot V-West Lighting
  • Cooper Hall Roof Replacement

Buffalo State College

  • Moore Hall Rehabilitation
  • Roof Replacement – Various Buildings Group B
  • Campbell Student Union Asbestos Abatement and Rehabilitation

Canton

  • Athletic Site Reconstruction
  • Elevator Services
  • Summer Water Heater

Cobleskill

  • Day Care Center
  • Dairy Complex

College of Environmental Science & Forestry

  • Replacement of Main Electrical Feeders
  • Master Plan
  • Display Room
  • Moon Library Electrical Modifications
  • Marshall Hall

Cortland

  • Bishop Hall Renovation
  • Hayes Hall Renovation
  • The Glass Tower – New Dormitory
  • Sperry Learning Resource Center
  • Fuel Dispensing Station
  • Miller Administration Building – First Floor Rehabilitation
  • Clark Hall Building Rehabilitation
  • Higgins Hall Building Rehabilitation
  • Park Center Sanitary/Storm Replacement

Downstate Medical Center

  • Facility Assessment Survey

Fredonia

  • Mason Hall Annex Extension of Existing Fire Alarm System
  • Jewett Hall Air Handling Unit
  • Fenton/Reed Sidewalk Lighting Design of Pole Mount Exterior Lighting
  • Campus Wide Mass Notification System
  • Kasling Hall Interior Renovations
  • Maytum Hall Electric Feeder Replacement
  • Maytum Hall Access Control System
  • Thompson Hall Mass Notification System
  • McEwen Hall / Reed Library Access Control, Electrical and Door Installation
  • Grissom Hall Interior Renovations
  • Athletic Complex Lighting
  • Thompson Hall Fire Alarm Upgrades
  • Thompson Hall Mass Notification System
  • Campus and Community Children’s Center Site Utilities

Geneseo

  • Dormitories Master Plan

Institute of Technology

  • Adirondack Hall Lightning Protection Study
  • Donovan Hall Boiler Replacement
  • Kunsella Hall Air Intake Evaluation

Morrisville

  • Oneida Residence Hall Renovations
  • Cayuga Residence Hall Renovations
  • Dairy Complex
  • Cayuga Residence Hall Renovations
  • Emergency Generator
  • Shannon Hall Evaluation

Oneonta

  • Chiller Replacement and Cooling Tower Modification
  • Wilber Hall Renovation
  • Rehabilitate Sciences Building (Study)
  • Littell Hall Additions and Renovations
  • Golding Hall Renovations
  • Tobey Hall Data / Telephone Systems

Onondaga Community College

  • Master Plan
  • Applied Technology Center
  • Telephone System
  • Maintenance Building HVAC work
  • Ferrante Hall Renovation

Oswego

  • New Townhouse Complex
  • Fire Safety Improvements
  • Laker Hall Weigh Room Replace Bleachers / Refinish Floor
  • Lakeside Dining Hall Asbestos Removal
  • Master Plan

Plattsburgh

  • Plaza Lighting
  • Storage Room Sprinkler
  • Rehabilitation of Park Hall Auditorium
  • Site Lighting Improvements
  • Art Building
  • Snygg Hall Renovation
  • Rich Hall Commissioning
  • Elevator Rehabilitation
  • Infirmary Building HVAC

Potsdam

  • Replace Emergency Generators

University at Buffalo

  • Jacobs Hall Addition
  • North Campus ADA Improvements
  • Roof Replacement – 7 Building

Upstate Medical University

From 1991 to the present, RAM-TECH has provided mechanical / electrical design and construction administration services for various projects in nearly all of SUNY Upstate’s buildings:

Campus Activities Building

  • Upgrade Electrical Infrastructure
  • Renovate Room 210 CAB
  • Campus Activities Building Study
  • Provide Emergency Power

Campus West Building

  • 3rd Floor Computer Room Power Changes
  • Computer Room Upgrade
  • Regional Oncology Center
  • CWB 2nd Floor Renovate for Offices

Clark Tower

  • 2nd, 3rd & 4th Floor Renovations
  • Emergency Generator (designed, but not constructed)

Institute For Human Performance

  • Clinical Research Unit Renovations

Miscellaneous    

  • Parking Lot I Lighting System
  • Parking Garages East and West
  • Exterior Lighting Upgrade
  • Campus Enhancements
  • Adams Street Beautification
  • West Parking Garage Demolition Study

Silverman Hall

  • Roof Replacement

Jacobsen Hall

  • Satellite CDU Study
  • Relocate CDU Test Booths
  • Provide Emergency Power
  • Code Compliance Study
  • Sprinkler System
  • Fire Alarm System
  • Asbestos Abatement
  • Fire Safety Improvements
  • 2nd Floor Renovations
  • 4th Floor Fire Protection Changes
  • 6th Floor Renovations
  • As‑Builts (Floors 5, 6, 7)

University Health Care Center

  • Code Review and Feasibility Study

Weiskotten Hall Addition

  • Transformer Replacement
  • 9th Floor Renovation, Sprinkler System and Kitchen
  • Microbiology Lab 2273
  • Emergency Transfer Switches
  • Renovate Room 1273

Weiskotten Hall

  • Renovate Electron Microscope Room 101
  • Pharmacology 3 Study
  • DLAR Tunnel Washer Install
  • Gross Anatomy Lab Renovations.
  • Angiography Laboratory Rehabilitation
  • Rehabilitation – Phase II
  • Southeast Wing Renovations
  • Pharmacology
  • Pathology Department Office Layout
  • Anatomy Labs Rooms 1139/1141/1142
  • Renovate Gross Pathology Lab 2135/2137
  • Renovate Rooms 1166/1201, 1223-1227, 1254, 1201, 1166
  • Renovate Lab 1138

University Hospital

  • University Hospital Capital Plan
  • Cancer Center Site Utilities Relocation
  • Vertical Expansion / Golisano Children’s Hospital
  • UH Complex Medical Gas Upgrades
  • Pharmacy & OR Sterilization Expansion
  • Automate East Wing Substation “A” and “B” Tie Breakers
  • HDR Brachytherapy
  • Radiation Oncology Dosimetry
  • Lobby Expansion
  • 1st Floor Admission/Registration
  • Phlebotomy
  • UH Continuum of Care/Lobby
  • OB/GYN
  • Urology Clinic and Offices
  • UH Pain Treatment Clinic
  • EMG/Clinical Neurophysiology
  • Gift Shop and Coffee Bar
  • EP Lab Renovations, 3 North
  • Neuroangio 3 West Renovations
  • 3 North Humidification Project
  • UH 3rd Floor West Radiology Renovations
  • UH Emergency Department Renovations
  • 4N/4C Omnicell
  • Refurnish Psychiatric Inpatient Unit 4B
  • UPS System ‑ 4th Floor
  • Morgue Alterations for Body Coolers
  • New Pharmacy Carousels
  • Fan Guard Survey & Design
  • Cytology/Histology 6 South Renovations
  • UH Pathology 6 South Renovations
  • Clinical Research Lab Room 6709
  • 6th Floor ICU Room Renovation
  • North Wing Patient Bath Room 4209
  • Replace Neurostar Equipment
  • ASC Pediatrics Reconfiguration
  • FUJI X-ray Machine Install
  • 7 North Renovations
  • 7A Renovations
  • Rehab Labs and Vivarium Space
  • 9th Floor Telephone Room Renovation
  • Pediatrics Security Upgrade
  • OR Endoscopic Surgery Renovations
  • Non Acute Short Stay Unit
  • UH Pathology Core Lab Renovations
  • Vascular Laboratories
  • Bone Marrow Observations
  • Install Booster Pumps East Wing Addition
  • Food Service Dishwasher Install
  • Boiler Plant RO System
  • BL2 Heating Coil Replacement
  • UH Rack Washer Install

Leave a Comment

Your email address will not be published. Required fields are marked *